Observation
What was actually measured?
A surface feature, a locator response or an exposed asset needs a method, position reference and date.
Buried evidence / Independent field notes
A drawn utility route is a claim about the ground, not proof of what is there. Learn how records, survey observations and AI-assisted inference form an evidence chain—and where that chain still needs verification.
Start with the gap
That clean line may originate in a design drawing, a digitised paper plan or a recent survey. Those sources do not support the same conclusions. A route can look precise on screen while its position, depth, ownership or operating status remains uncertain.
Responsible mapping keeps three things separate: inferred routes proposed from incomplete evidence, surveyed observations tied to a documented method and location, and field verification that supports a specific decision. Even direct exposure is evidence at a place and time, not a guarantee along the whole network.
Observation
A surface feature, a locator response or an exposed asset needs a method, position reference and date.
Interpretation
A connected line may contain interpolation. Record the join rather than letting a smooth drawing conceal it.
Measure before merging
Ground-penetrating radar responds to contrasts in the subsurface. Electromagnetic locating traces suitable conductive paths under appropriate conditions. Neither produces a complete, automatically identified inventory.
Document survey coverage, surface conditions and unsuccessful passes alongside interpreted results. A non-detection is not proof of an empty corridor.
Read the sensing guide →
Four linked investigations
Follow each hand-off from source material to a decision-ready record. Automation belongs inside this chain, not above it.
Evidence file 01
Audit provenance, coordinates, asset identity and conflicting drawings before treating geometry as ground truth.
Open records →Evidence file 02
Separate instrument responses from interpreted assets and preserve the limits of survey coverage.
Open sensing →Evidence file 03
Use AI to propose connections without turning probability into invented positional accuracy.
Open models →Evidence file 04
Connect mapping uncertainty to competent review, site-specific checks and controlled record updates.
Open verification →A decision boundary, not a disclaimer in small print
A model cannot clear a site for excavation. Neither this website nor a screen image establishes safe digging conditions. Groundwork needs current utility-owner information, competent on-site investigation and the applicable local safe system of work.
Show uncertainty where the decision is made. Keep detection gaps, contradictory sources and unverified depths visible in exported maps and briefings, not only in a database that the field team may never see.
Keep asking what supports the line
No. Missing records, difficult ground conditions and unfamiliar network patterns can leave assets undetected or misclassified.
Explore all nine questions →