Ask what decision needs evidence
A strategic corridor study and intrusive work at a proposed crossing do not require identical evidence. The first may compare broad constraints; the second can depend on the position and condition of individual assets. Define the decision, its consequences and the unresolved questions before deciding whether existing records and surveys are sufficient.
The responsible project team must obtain current information from relevant utility owners and follow applicable local requirements. A general educational page cannot identify every owner, permit, notification duty or site hazard. Nor can it determine which investigation or protective measures are appropriate for a particular worksite. Those judgements belong to competent people with access to the actual conditions.
Keep the evidence package usable at the point of work. A map should show its coverage, date, evidence classes and unresolved conflicts. Critical limitations should accompany printed extracts and briefings rather than remaining in a distant database. If a plan has been simplified, the simplification must not convert an inferred route into an apparently surveyed asset.
Treat direct observation as local evidence
Appropriately planned exposure can provide direct observations of an asset at a specific location. The method, permissions and controls must be determined by competent practitioners under the relevant safe system of work. This guide does not prescribe how to expose services or provide operational instructions for excavation, testing or handling.
Document what was actually observed: position reference, measurement method, visible asset characteristics, date and the relationship to surrounding control. Where depth is recorded, state the reference surface and the part of the asset measured. Photographs can support the record, but they need context and do not replace suitable measurements.
An observed pipe at one point does not verify its route between distant points. It may bend, change level, connect to an unexpected branch or differ from the asset identified in a nearby record. Retain the boundary between directly observed sections and interpolated connections. Verification should narrow specific uncertainties, not erase every uncertainty in the drawing.
Resolve discrepancies before they become assumptions
A mismatch between the field and the map is new evidence, not an inconvenience to be hidden. The asset may have been misidentified, the record may be outdated, or the coordinate reference may be wrong. Keep those explanations open until competent review can distinguish them. For planned work, unresolved discrepancies must be addressed through the project’s safe system of work before affected activities proceed.
Contact with the relevant owner or responsible authority may be needed to interpret an unexpected asset or status. A label such as “abandoned” does not prove disconnection or absence of hazard. Physical appearance alone may not establish ownership or contents. This site cannot assess live conditions, interpret a suspected utility emergency or provide emergency response instructions.
Separate evidence review from programme pressure. A record should say who accepted an interpretation, on what basis and for which scope of work. If the evidence is insufficient, the outcome can be a deferred decision or a request for further investigation. A workflow that allows only “approved” encourages uncertainty to disappear administratively rather than being resolved.
| Statement | What it does not establish |
|---|---|
| Asset observed at a documented point | Continuous alignment beyond the observed location |
| Survey response compatible with a record | Confirmed asset identity or operating status |
| Updated owner information received | Completeness of all buried infrastructure |
| Evidence reviewed for a defined decision | Unrestricted approval for different work or later conditions |
Return the observation to the record
The verification loop closes when new evidence updates the shared record without destroying its history. Retain the previous geometry, the reason for the change and the supporting observation. Assign stable identifiers so that a corrected asset can be followed across drawings, survey outputs and subsequent decisions. Version control is part of safety-relevant information management, not merely a software convenience.
Feed verified observations back into model evaluation only with their actual scope intact. A small exposed section should not label an entire predicted network as correct. Likewise, preserve failed hypotheses and non-matches. Those cases reveal where the model, source material or interpretation workflow needs improvement.
Use current source guidance appropriate to the jurisdiction. HSE HSG47 explains principles for avoiding danger from underground services in the UK; German projects should consult relevant utility-owner requirements and applicable guidance from bodies such as DGUV, DVGW and VDE. These are different sources with different scopes, not interchangeable certificates. Competent site-specific planning remains essential, and no page on this website substitutes for it.